Integrated Optimization of the Whole System, Work Package 3

1500 856 hpadmin

The aim of this Work Package is to carry out all the activities related to the phase of optimization and pre-construction development of HEART and thus ensure the synergic integration among all the different subcomponents. In detail, according to the features of the existing components/solutions of each Consortium partner and on the basis of the continuous inputs of Work Package 2, the task will optimize technical specifications of each element of the system to allow its synergic integration, carefully considering the constraints set out by each partner. The Work Package will also evaluate the life cycle environmental and cost performance of the components and the entire system to be developed.